FROM FIRST IDEA TO FINISHED GARMENT · ISTANBUL, TÜRKİYE
SAMPLING & APPROVALS

Approve the details before they multiply.

Use samples to validate fit, materials and construction before committing those decisions to bulk production.

Updated 2026-10-22 · Practical sourcing reference
Every page includes a TUGHAN TEXTILE watermark.
In this guide · 9 practical sections
Illustrative clothing development and material details
Editorial illustration · product and process references are confirmed for each order.

Know which sample you are reviewing

A development sample explores construction; a fit sample checks dimensions and balance; a pre-production sample confirms agreed production details. Not every project needs the same sequence. State which materials and details are final and which are temporary before judging a sample.

Review systematically

Measure using the agreed method, check movement, review seams inside and outside, assess fabric hand feel and opacity, and confirm artwork size and placement. Compare the sample to a dated specification. Consolidate feedback into one revision rather than sending disconnected instructions across several conversations.

Our order-linked sample policy

For new projects, sampling follows a confirmed order rather than an uncommitted standalone sample request. One sample per agreed model and colour is included after order confirmation. A further sample required because of a change after sampling is charged at twenty times the quoted unit price. Confirm the exact scope in your written offer.

Timing and approval

The standard sample estimate is 7–14 days after order confirmation and receipt of the required specifications and available materials. Custom fabrics, special trims and revisions add time. Bulk production is usually 4–6 weeks on the confirmed schedule; material procurement and shipping are separate planning items.

When the sample feels different from the photograph

Light, styling and image processing do not communicate hand feel. Compare the physical sample against an agreed swatch and record GSM, structure, composition, finish, drape and washed appearance. Describe the difference precisely: too stiff, too thin, overly brushed or insufficient recovery. Decide whether the correction is a material change, finishing trial or pattern change, and request the cost and schedule impact before another sample.

Sample approval is a set of decisions

Review fit, measurements, fabric, shade, workmanship, decoration, trims, labels and packing separately. Record pass, revise or pending for each. A fit sample in substitute fabric cannot approve final colour or hand feel. A pre-production sample should identify any substitutions explicitly. At Tuğhan Textile, sampling is linked to an agreed order; the project quotation confirms development scope, payment and timing.

What happens when a sample is revised?

Combine comments into one numbered revision rather than sending contradictory changes across several messages. Identify any new design request separately from correction of an agreed requirement. Ask which work is included and which incurs a further development charge. Bulk timing depends on written approvals and material readiness; a sample dispatch date is not automatically a production start date.

PRACTICAL REFERENCE

Who approves what?

StageTypical ownerEvidence to keepRisk to avoid
Brief reviewBrand / developerVisuals, BOM, POM, quantity splitUnresolved construction or impossible cost target
Material reviewSupplier + brand approvalComposition, gsm, width, shade and finishMaterial substituted without approval
Pattern / fitPattern maker + brand fit reviewBase size, measurement method, revision notesBody chart mistaken for garment chart
Decoration trialDecorator + brand approvalActual substrate, artwork and placementBulk starts from a screen-only colour approval
Pre-production approvalBrand + production teamIdentified sample and controlled fileConflicting instructions in separate messages
Bulk controlsProduction / QCFirst-off and inline recordsAn issue repeats through the whole run
Final releaseBrand / agreed inspectorMeasurements, workmanship, packing, exceptionsMissing labels, wrong breakdown or unapproved deviations
PRACTICAL REFERENCE

Turn sample feedback into an actionable change.

Weak feedbackClearer instruction
Make it longerSample R1: HPS length measured 68 cm; target 70 cm after agreed care. Review pattern adjustment.
The neck looks wrongRecord relaxed neck width/depth and rib appearance; compare to the identified fit reference.
Print should be higherMove artwork top edge to the stated distance below the centre-front neck seam; keep artwork size unchanged.
Waist is too tightRecord relaxed and agreed stretched waist, wearer fit feedback and target values. Review elastic and pattern together.
Quality is not goodIdentify seam/panel, photograph the issue, describe the observed defect and reference the acceptance criterion.

Downloadable checklist: select the relevant approval items below and keep a copy with your sample notes.

0 / 10 completed

Questions, answered

Can I receive a free sample before ordering?

The standard policy is one sample per model and colour after order confirmation. We do not begin sample development for unconfirmed startup enquiries.

What happens if I change the design after the sample?

The change is reviewed for cost and timing. A new sample caused by a post-sample change is charged at unit price × 20 under the standard policy.

What is a size set?

Samples in selected or all sizes used to evaluate the grading and fit across the range; agree which sizes and materials are required.

Can I approve fit with a different fabric?

It may communicate shape, but fabric differences can invalidate drape, recovery and shrinkage conclusions. Identify temporary materials and confirm the final sample route.

How should I write fit feedback?

Name the POM, record actual and target values, state the exact change and reference the sample/file revision. Avoid vague or conflicting instructions.

Can I approve from photos alone?

Photos can help review visible details but cannot fully establish hand feel, fit or hidden construction. Agree which approvals require physical review.

Why does the sample look softer online than it feels in my hand?

A photograph cannot establish hand feel. Compare the physical material, finish and washed result with an approved swatch, then describe the specific difference and agree the development response.

Can I approve fit now and colour later?

Yes, if the approval record explicitly separates the decisions. Do not let an approval of one property be interpreted as permission to start production with other properties still pending.

Is the first sample automatically the final production standard?

Only after the relevant properties are reviewed and approved. Identify substitutions and unresolved issues; keep the approved sample ID and specification revision in the record.

Ready to turn this into a working brief? Use the free tools below, then send a complete specification for a manufacturing review.

A clearer brief. A better next step.

Bring your ideas, specifications and quantities. Let’s review what is possible.

Request a manufacturing review ↗